Scissor lifts in a glazed atrium

Roofs.Facades.Glazing.One TEAM.

We inspect, repair and replace the outside of commercial buildings, anywhere in the UK.

Exchange Place, EdinburghInternal glazing replacement

Who we've worked with

TescoCBREWaitroseSavillsPremier InnCushman & WakefieldSTVAldiBabcockScottish Prison ServiceEngieGardiner & TheobaldSyngentaSRU InsulationThomasons

What we do

One team for the whole building envelope.

The envelope is everything that keeps the weather out: roof, walls and glass. We look after all of it, so you only make one call.

All services

Replacement, planned maintenance and electronic testing that can find a leak as small as a screw hole.

The TEAM crew with their vans outside the Glasgow office, raising funds for Beatson Cancer Charity

Spot it early

We identify issues before they have a real impact on your building.

Minimal disruption

The necessary work, done as quickly as possible.

Nationwide

A responsive service from Glasgow to sites across the UK.

Who we are

To put it simply, we take care of the outside of your building.

TEAM stands for Total Envelope Asset Management. Since 1997 we have kept commercial roofs, facades and glazing working as they should.

Our brand promise

  • Honest
  • Reliable
  • Respectful
  • Client focused
  • Integrity
More about TEAM

How we work

Four steps. No surprises.

  1. 1

    Inspect

    We get up there and look, by abseil, crane, tower or platform.

  2. 2

    Report

    You get a photographic report with the remedials and costs for your CapEx budget.

  3. 3

    Fix

    Safe systems of work and RAMS for every job, with minimal disruption.

  4. 4

    Guarantee

    24 months on our workmanship. Up to 20 years from the manufacturer on new roofs.

1997

Established

24

Month workmanship guarantee

Up to 20

Years manufacturer's guarantee on new roofs

UK

Nationwide coverage from Glasgow

Recent work

Fresh off the scaffold.

All projects
The same window frame after reconditioningWindow frame with chipped, failing paintBeforeAfter

Reconditioned, not replaced

Drag the slider. Airless spraying is a cost effective alternative to a full replacement.

Aluminium pipe step-over installed by TEAM on the roof of the Ibis Hotel, Springfield Quay

Roof / 2026

Ibis Hotel, Springfield Quay

Pipe step-overs fitted on the roof as part of ongoing remedial works.

Scaffold along a green clad industrial building ahead of asbestos removal

On site / 2026

Safe access for asbestos strip-out

Scaffold up ahead of asbestos strip-out works. Safe access, safe removal.

The level of service, care, attention and open honesty we have received from TEAM Ltd has been quite remarkable!!

Howard Crawshaw

Managing Director, Knight Property Group

1 of 2

What clients say

Open honesty, on every job.

Accredited

Fully qualified, ready to work with you.

See them all
Avetta
Constructionline
Alcumus ISOQAR
CHAS
Achilles

Get in touch

Tell us about your building.

Planned work or a problem you have just spotted, we can help.

Wright Business Centre, 1 Lonmay Road, Glasgow G33 4EL